Please attach the required documents for a completed compiled PDF
Draft Review
1. Site Plan, Roof Plan
2. Elevations
3. Floor Plans
Preliminary Review
1. Survey (signed and sealed)
2. Site Plan, Roof Plan, Data Block, Overhangs
3. Elevations
4. Floor Plans (revisions if any, are to be indicated inside red clouds)
5. Electrical Plans (exterior)
6. Detail & Sections Sheet and Lighting specifications (often on the same sheet)
Final Review
1. Signed and notarized Owner's agreement
2. Site Plan, Roof Plan, Data Block (often on same page)
3. Elevations
4. Floor Plans (revisions if any, are to be indicated inside red clouds)
5. Electrical Plans (exterior)
6. Detail & Sections Sheet and Lighting specifications (often on the same sheet)
7. Paint/Color Application
8. Landscape Plan
9. Any applicable specification sheets