Paint/Roof Color Application for Review
 
This application is for paint/roof color changes. If an approved Paint/Roof Color Review application is on file, no approval shall be required to repaint the exterior of a structure or apply a new roof of similar material with the originally approved color scheme. If an approved Paint/Roof Color Review application is NOT on file, one must be filed with the ARC for review and approval before proceeding to paint. NOTE: A change of roof MATERIAL requires a Minor Change application and fee (see page 24 of the Design Guidelines for further details).
 
The following is required for a complete submission:
  • Complete Paint Application-please use upper and lower case letters when filling out this application. (You will receive a confirmation of submission once this form is completed.)
  • Manufacturer’s chips, if the color pallet varies from previously approved application
  • All Paint/Color applications must include a front, exterior photo of the house and manufacturer paint chips; for New Construction applications, roof samples must also be included
  • Photos of elevations affected by new palette
  • $125 Paint/Color Change Review fee                                                                                             
Paint chips and roof samples may be mailed to or dropped off at Bald Head Association, ARC Department (mail to: PO Box 3030, Bald Head Island, NC 28461 or drop off at: 111 Lighthouse Wynd, Bald Head Island, NC 28461).
 
For any questions regarding submittals, contact the Architectural Review Committee (ARC) Department at Allison@baldheadassociation.com or 910-457-4676, ext. 23.
 
*Items with an asterisk (*) are required.

Save & Return

Use an account to return to saved work.
Is this Paint application in response to a violation? *
If "Yes," what violation type?
 +

Powered byFormsite